A frigid February day and the snow was creakingly cold, but it was not a challenge for the crew! Modules arrived, were set and connected by the end of the day. That crane, by the way, was about 2 inches from the top of a concrete footing, now that's skillful parking!
The cooler temperatures have arrived, so it seemed like the perfect time to have an entire house go up in a day. The photos above show a custom BrightBuilt Home that was just set this week in Great Barrington, Massachusetts.